Our work · Tiling & Plumbing
A tiled shower room, wall to floor
Finished

Library photograph — our own project photography lives on Instagram
Almost everything that goes wrong in a shower room is decided before any tiling starts. Whether the wet area was tanked. Whether the floor falls to the gully or towards the door. Whether the substrate flexes. Whether there is ventilation that actually moves air out of the building.
Then comes the setting out. Full tiles at eye level and at the outside corners, cuts balanced rather than dumped down one side, floor grout lines lining through with the wall. None of that costs more in materials; it costs an hour with a laser and a pencil before anyone opens a bag of adhesive.
Our tiler and our plumber are the same company, so the shower valve height, the niche position and the tile module are agreed in one conversation rather than discovered in three.
Work carried out
- Wet area tanked and sealed
- Substrate checked and stiffened
- Falls set to the gully
- Setting-out agreed before fixing
- Wall and floor tiling
- Silicone lines, trims and second-fix sanitaryware


